DIGIT Works
PlatformDomainsAcademyDesign SystemFeedback
Works v0.2
Works v0.2
  • Introducing DIGIT Works Platform
  • Platform
    • Release Notes
      • MDMS & Configuration Updates
      • Test cases
      • Data Migration
      • Service Build Updates
    • Platform Capabilities
    • Architecture
      • High Level Design
      • Low Level Design
        • Registries
          • Individual
          • Bank Account
          • Organization
        • Services
          • Project
          • Estimates
          • Contracts
          • Attendance
          • Muster Roll
          • Expense
    • Functional Specifications
      • Project
      • Estimates
      • Organisation
      • Attendance Management
      • Muster Roll
      • Expenditure / Billing
      • Contracts
    • Platform Services
      • Project
      • Estimate
      • Contracts
      • Attendance
      • Muster Roll
      • Expense
      • Bank Account
      • Organisation
    • Source Code
    • Roadmap
    • Installation
    • Configuration
      • Service Configuration
        • Project
        • Estimate
        • Contract
        • Attendance
        • Muster Roll
        • Expense
        • Bank accounts
        • Organisation
        • Individual
  • Products
    • Works App
      • UX Design
      • Technical Design
      • Field App User Manual
      • Configuration Manual
      • Technical Manual
  • Programmes
    • MUKTASoft v1.0
    • MUKTASoft v1.1
      • Specifications
        • Roadmap
        • User Persona
        • Functional Requirements
          • Product Requirements Document
          • User Stories
            • Time Extension
              • CBO: Create Time Extension
              • Time Extension Workflow
              • EMP: Create Time Extension
              • Search and View Time Extension
              • CBO: My Requests
              • CBO: Edit Time Extension
            • JIT-FS Integration
              • Fund Allocation Register
              • Create Payment Instruction
              • PIS: Payment Instruction Status
              • PAG: Payment Advice Status
              • PD: Update payment details
              • FD: Update Failed Payments
              • Create Revised Payment Instruction
              • Revised PI: Update payment details
              • Revised PI: Updated Failed Payments
              • Search Payment Instruction
              • View Payment Instruction
            • Work Order
              • Create Work Order
              • Work Order Workflow
              • Work Order Inbox Page
              • Create/ Submit Work Order
              • Edit/Submit Work Order
              • Verify & Forward
              • Send Back
              • Send Back To Originator
              • Reject Work Order
              • Approve
              • Search Work Order
              • Work Order PDF
            • Dashboard v1.0
      • Deployment
        • Release Notes
          • Service Build Updates
          • MDMS & Configuration Updates
          • Gate 2 Release Checklist
          • Test Cases
        • Deployment Guide
          • Dashboard Reindexing
        • MuktaSoft Services
          • IFMS Adapter
          • Expense Calculator
          • Works PDF
          • Bill Scheduler
        • Configuration
          • Master Data Templates
            • Project Type
            • Target Demography
            • Unit Of Measurement (Units)
            • Overheads
            • Skill Category & Skills
            • Community-Based Organisation Roles
            • Scheme
            • Expense Heads
            • Standard Deductions
            • Organisation Type
            • Organisation Sub Type
            • Organisation Functional Category
            • Organisation Class/Rank
            • HRMS Sections/Departments
            • HRMS Designation
            • HRMS Employment Type
            • User Role
            • Organization
            • Wage Seeker
            • Tenants
            • Ward Boundary
            • Locality Boundary
            • Payment Advice Format
            • Users Data
          • Notifications & SMS Templates
          • Localisation
          • Platform Service Configuration
          • UI Configuration
            • Common Configurations
              • Role Configuration
              • MDMS Configuration
              • APK Generation
            • Modules
              • Project
              • Estimate
              • Workorder
                • Time Extension
              • Muster Roll
              • Bill
              • Organization
              • Wage Seeker
              • Wage Seeker (CBO Application)
              • Attendance (CBO Application)
              • Muster Roll (CBO Application)
              • Mukta Dashboard
              • IFMS Adapter UI
            • Drafts
              • Contracts
                • Create Contract
                • Contract Workflow
                • Modify Contract
              • Estimate
                • Create Estimate
                • Estimate Worflow
                • Modify Estimate
              • Attendance Management
                • Inbox
                • View Attendance
                • Modify Attendance
        • Customisation
          • Works UI
            • UI Tech Flow Diagrams
          • UI Screens Customisation
            • Document Upload Container
            • CSS Customisation
            • Inbox/Search Screen
      • Implementation
        • Pilot Roll Out Plan
        • Pilot Go Live Definition
        • Pilot Sucess Metrics
        • Adoption Metrics
        • Adoption Template
        • Implementation Plan & Checklist
        • Issue Management - Standard Operating Procedures
        • Training Resources
          • User Manual
            • Getting Started
            • CBO User Manual
              • CBO - Getting Started
              • My Works
              • Track Attendance
              • Muster Rolls
              • My Bills
              • My Requests
            • Employee User Manual
              • Project
              • Estimate
              • Work Order
              • Billing
              • Registries
              • Organizations
              • Payments
          • Training Videos
  • COMMUNITY
    • Discussion Board
    • Issues
Powered by GitBook

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.

On this page
  • Context
  • Scope
  • Actors
  • Details
  • Attributes
  • Validations
  • Configurations
  • Workflow
  • Actions
  • Notifications
  • User Interface
  • Acceptance Criteria

Was this helpful?

  1. Programmes
  2. MUKTASoft v1.1
  3. Specifications
  4. Functional Requirements
  5. User Stories
  6. Work Order

Create Work Order

Context

Once an estimate is prepared and approved, the next step is to award the work to a contractor, to decide the various methods used like Tendering, Quotation and Nomination. Once a contractor is decided a work order is created in the favor of the contractor.

In MUKTA, it is a nomination method to decide a CBO (community-based organization) and then the work order is created in the name of that organization.

Scope

Create Work Order

Search Estimate → View Estimate → Create Work Order.

Actors

Employee

Role: Work Order Creator

Details

  1. CBO to whom the work is awarded is decided offline and then the work order is created in the name of CBO.

  2. Create Work Order form is developed as per the UI design provided and the attributes listed below.

  3. To create the work order estimate is searched and opened to view the details. From the action menu Create Work Order is selected.

Attributes

#

Field

Data Type

Required

Description

1

Project ID

Display Only

NA

Project ID of the project.

2

Date of proposal

Display Only

NA

Date of the proposal from the project.

3

Project name

Display Only

NA

Project name

4

Project description

Display Only

NA

Project description

5

Work Order Details

Tab

6

Name of CBO

Drop-down

Y

  1. Organization type community based organization from the organization master maintained at the ULB level are only allowed.

  2. Only Active organizations and the organization valid to date is above work order created date are listed under drop-down or allowed to search.

  3. The name is searchable in the drop-down and search is start with min 3 characters has to be entered.

  4. Search is performed for the CBOs registered within the ULB.

7

CBO ID

Display

Y

The CBO ID from the organization registry.

8

Role of CBO

Drop-down

(Auto- selected)

Y

The role of the CBO is decided based on the estimated amount. It is configurable in the system.

  1. IP (Implementation Partner) - If the estimated cost of the works is more than Rs.15 Lakhs

  2. IA (Implementation Agency) - If the estimated cost of the works is up to Rs.15 Lakhs

9

Name of the officer in-charge

Drop-down

Y

  1. The drop-down values are population based on the role assigned.

  2. The name is searchable in the drop-down with min 3 characters entered. Name + Designation;

  3. Search is performed within the employees having the role OFFICER_IN_CHARGE.

10

Designation of officer in-charge

Display

Y

Displayed from the EIS/User’s record saved in the system.

11

Project completion period (in days)

Numeric

Y

Number of days work to be completed.

Min Value: 1 day.

12

Work order amount

Read Only

Y

Total estimated Amount - Overhead Amount (Sum of all which are not a work value)

13

Labour and Material Analysis

14

Labour Analysis

View Document

Y

The labour analysis file attached to estimate to be displayed here.

15

Material Analysis

View Document

Y

The material analysis file attached to estimate to be displayed here.

16

Relevant Documents

Sections

17

BOQs

File Attachment

Y

Allows single file, not greater than 5 MB. Files can be of type doc,docx, xls,xlsx pdf, jpg.

18

Terms and conditions

File Attachment

N

Allows single file, not greater than 5 MB. Files can be of type doc,docx, xls,xlsx pdf, jpg.

19

Others

Textbox

N

To capture the file name

20

File Attachment

N

To attach the file file the name entered above in the textbox.Allows single file, not greater than 5 MB. Files can be of type doc,docx, xls,xlsx pdf, jpg.

21

Terms and Conditions

Tab

22

Description

Alphanumeric

N

Grid of textbox to enter the terms and conditions as bulleted list.

Validations

  1. Field-level validations as mentioned in the attribute tables.

  2. Organization-type community-based organizations from the organization master maintained at the ULB level are only allowed.

  3. Only Active and Valid To >= Work Order Created Date, organization are listed under drop-down or allowed to search. The organization with the status “Inactive” and “Debarred” are not listed irrespective of valid to date.

  4. The minimum value for the work completion period should not be less than 1 day.

  5. The Role of CBO drop-down is selected automatically by the system based on the configuration provided.

    • IF the total estimated amount <=15 lakhs THEN the Role of CBO = IA AND the role can be changed by the user.

    • IF the total estimated amount is >15 lakhs THEN the Role of CBO = IP AND the role can not be changed by the user.

Configurations

The amount limit deciding the role of CBO should be configurable. At present it is 15 lakh.

Workflow

The stories for configuring the workflow are given separately.

Actions

On Submit

  • Submit workflow opens a pop-up window with the Forward option.

    1. The work order record is saved into the system and the workflow state changes to Pending for verification.

    2. The Work Order No. is generated in a specified format, if it is a direct submission.

    3. Format for Work Order No. is WO/FY/<6digitrunningno.>. Example: WO/2022-23/000051

    4. 6 DIGIT running sequence number is reset to 1 with the start of the new FY.

    5. The work order is available to download in PDF as per the given format. There will be a separate ticket for PDF download.

  • On cancel, the action is cancelled.

  • On successful forward the Success Page is displayed else the Failure Page is displayed.

Notifications

Not applicable.

User Interface

Acceptance Criteria

Acceptance Criteria
Description

1

The role of CBO is decided based on the logic provided.

2

On Forward, the work order is forwarded to the next user.

3

The work order number is generated as per the specified format.

4

On successful forward Success Page is displayed else Failure Page is displayed.

PreviousWork OrderNextWork Order Workflow

Last updated 1 year ago

Was this helpful?

DIGIT-Works