Utilization Statements

Scope

Utilization Statements

Utilization statements are generated for measurement of work completed and captured in a MB. Utilization statements can be viewed and download from MB view screen.

Actors

ULB: MB creator, verifier, approver and viewer.

Details

  1. The utilization statements are generated out of saved MB details.

  2. First, these are generated SORs wise.

  3. Second, get consolidated to have Material Wise, Labour Wise, and Machinery Wise View.

  4. The attributes and format is same for all three.

  5. The option to download into PDF is provided.

  6. The attributes defining detailed estimate are given in below table.

Sr. No.

Field Name

Description

1

Code

SOR code of type material, labour, or machinery.

1.2

Description

SOR description of type material, labour, or machinery.

1.3

Unit

The unit of measurement

1.4

Rate

Rate per unit

1.5

Quantity

Total quantity required for the given SOR item.

1.6

Amount

Amount calculated rate*quantity.

1.7

Total

Total of all the material required for a given SOR item.

2

Grand Total

Total of all the material required.

Material Wise Consolidation

1

Code

SOR code of type material, labour, or machinery.

2

Description

OR description of type material, labour, or machinery.

3

Unit

The unit of measurement

4

Rate

Rate per unit

5

Quantity

Total quantity required.

6

Amount

Amount calculated rate*quantity.

7

Total

Total of all the material required.

Actions

Not applicable.

Validations

Not applicable.

Configuration

Not applicable.

Notifications

Not applicable

User Interface

HTML View:

PDF View:

Acceptance Criteria

  1. Utilization is generated of material, labour and machinery required.

  2. The format and template is same for all three.

  3. Option to download these into PDF to be provided.

Last updated

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.