Download of analysis statements

Scope

Analysis statements are generated out of an estimates and shared with CBO along with WO.

Actors

CBOs

Details

  1. The analysis statements are generated out of saved estimate details.

  2. These are generated SORs wise and then consolidated to have Material Wise, Labour Wise, and Machinery Wise View.

  3. The attributes and format is same for all three.

  4. The option to download into PDF is provided from Work Order Details View page.

    1. Labour Analysis

    2. Material Analysis

    3. Machinery Analysis

  5. The attributes defining detailed estimate are given in below table.

Sr. No.

Field Name

Description

1

Code

The item code from the lead charges

2

Description

The item name from the lead charges

3

Unit

The unit of measurement

4

Rate

Rate per unit

5

Quantity

Total quantity required.

6

Amount

Amount calculated rate*quantity.

7

Total

Total of all the material required.

Actions

Not applicable.

Validations

Not applicable.

Configuration

Not applicable.

Notifications

Not applicable

User Interface

Acceptance Criteria

  1. Analysis is generated of material, labour and machinery required.

  2. The format and template is same for all three.

  3. Option to download these into PDF to be provided.

Last updated

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.