Download of analysis statements
Scope
Analysis statements are generated out of an estimates and shared with CBO along with WO.
Actors
CBOs
Details
The analysis statements are generated out of saved estimate details.
These are generated SORs wise and then consolidated to have Material Wise, Labour Wise, and Machinery Wise View.
The attributes and format is same for all three.
The option to download into PDF is provided from Work Order Details View page.
Labour Analysis
Material Analysis
Machinery Analysis
The attributes defining detailed estimate are given in below table.
Sr. No. | Field Name | Description |
1 | Code | The item code from the lead charges |
2 | Description | The item name from the lead charges |
3 | Unit | The unit of measurement |
4 | Rate | Rate per unit |
5 | Quantity | Total quantity required. |
6 | Amount | Amount calculated rate*quantity. |
7 | Total | Total of all the material required. |
Actions
Not applicable.
Validations
Not applicable.
Configuration
Not applicable.
Notifications
Not applicable
User Interface
Acceptance Criteria
Analysis is generated of material, labour and machinery required.
The format and template is same for all three.
Option to download these into PDF to be provided.
Last updated