SOR Variant

Introduction

The term "SOR variant" might refer to a modified or specialized version of a standard Schedule of Rates (SOR). A "variant" implies a deviation or customization from the standard rates to meet specific project requirements, conditions, or unique circumstances. Here are a few scenarios where a SOR variant might be used.

  1. Excavation in Foundation

  2. Ground Floor

  3. First Floor

  4. Second Floor

  5. Third Floor

Data Table

Sr. No.CodeVariant Name

1

EF

Excavation in Foundation

2

GF

Ground Floor

3

FF

First Floor

4

SF

Second Floor

5

TF

Third Floor

6

FP

Foundation & Plinth

7

SG

Super Structure (GF)

8

SE

Super Structure (FF)

9

SS

Super Structure (SF)

10

ST

Super Structure (TF)

11

NA

Not Applicable

The data given in the table is sample data for reference.

Data Definition

#Column NameData TypeData SizeIs Mandatory?Definition/ Description

1

Code

Alphanumeric

64

Yes

A unique code that identifies the SOR variant.

2

Variant Name

Text

256

Yes

SOR variant name