Schedule of rates
Introduction
Schedule of rates are the items used to estimate civil works. The schedule is common across all the ULBs in a state while the rates specific to a ULB.
Data Table
FL00001
Works
Flooring
Ground Floor
Fixing tiles in floors, treads or steps and landing over 25mm bed of C:M (1:1) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete excluding the cost of pre-cast tiles
SQM
1
1307.80
3598.02
66.01
4.55
49.76
5026.14
CC00001
Works
Cement Concrete
Ground Floor
P.C.C. Grade M25 Using Batching plant, Transit Mixer and concrete pump (Data for 120.00 Cum)
CUM
120
329935.45
7095.84
49760.82
32001.01
15930
4347.23
439070.35
CC00002
Works
Cement Concrete
First Floor
P.C.C. Grade M25 Using Batching plant, Transit Mixer and concrete pump (Data for 120.00 Cum) [First Floor]
CUM
120
329935.45
7095.84
49760.82
32001.01
15930
4347.23
439070.35
LD00002
Labour
Un Skilled
Not Applicable
Survey Khalasi/ Chain Man
Nos
1
345.00
345.00
The data given in the table is sample data for reference.
Data Definition
1
Code
Alphanumeric
64
Yes
A unique code that identifies the SOR.
2
Type
Text
256
Yes
SOR Type
3
Sub Type
Text
256
No
SOR Sub Type
4
Variant
Text
256
No
SOR Variant
5
Description
Text
1024
Yes
SOR Description
6
UOM
Text
64
Yes
Unit of measurement
7
Quantity
Numeric
(6,0)
Yes
Quantity for which rate is defined
8
Material Rate
Numeric
(6,2)
No
Rate
9
Labour Rate
Numeric
(6,2)
No
Rate
10
Machinery Rate
Numeric
(6,2)
No
Rate
11
Conveyance
Numeric
(6,2)
No
Rate
12
Royalty
Numeric
(6,2)
No
Rate
13
Labour Cess
Numeric
(6,2)
No
Rate