Analysis Statements

Scope

Analysis Statements

Analysis statements are generated for an estimate. These can be navigated from estimate view screen using view analysis statement.

Actors

ULB: Estimate creator, verifier, technical sanctioner, approver and viewer.

Details

  1. The analysis statements are generated out of saved estimate details.

  2. First, these analysis statements are generated SORs wise.

  3. Second, they consolidated to have Material, Labour , and Machinery Wise.

  4. The attributes and format is same for all three statements

  5. Option to download into these statements into PDF is provided.

  6. The attributes defining detailed estimate are given in below table.

Sr. No.

Field Name

Description

1

SOR Description

SOR item from the estimate.

1.1

Code

The item code from the lead charges

1.2

Name

The item name from the lead charges

1.3

Unit

The unit of measurement

1.4

Rate

Rate per unit

1.5

Quantity

Total quantity required for the given SOR item.

1.6

Amount

Amount calculated rate*quantity.

1.7

Total

Total of all the material required for a given SOR item.

2

Grand Total

Total of all the material required.

Material Wise Consolidation

1

Code

The item code from the lead charges

2

Name

The item name from the lead charges

3

Unit

The unit of measurement

4

Rate

Rate per unit

5

Quantity

Total quantity required.

6

Amount

Amount calculated rate*quantity.

7

Total

Total of all the material required.

Actions

Not applicable.

Validations

Not applicable.

Configuration

Not applicable.

Notifications

Not applicable

User Interface

HTML View:

PDF View:

Acceptance Criteria

  1. Analysis is generated of Material, Labour and Machinery required.

  2. The format and template is same.

  3. Option to download these into PDF to be provided.

Last updated

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.