SOR Type

Introduction

Schedule of Rates (SOR) is a comprehensive list of prices for various construction activities, materials, and services. These rates are categorized based on their nature and usage, and these categories are often referred to as SOR types. The purpose of categorizing rates is to provide a standardized and systematic way of estimating costs for construction projects. There are mainly four types of SORs.

  1. Labour

  2. Material

  3. Machinery

  4. Works

Data Table

Sr. No.CodeName (In English)Name (In Local Language)

1

M

Material

2

L

Labour

3

E

Machinery

4

W

Works

The data given in the table is sample data for reference.

Data Definition

#Column NameData TypeData SizeIs Mandatory?Definition/ Description

1

Code

Alphanumeric

64

Yes

A unique code that identifies the SOR.

2

Name (In English)

Text

256

Yes

SOR Type in English

3

Name (In Local Language)

Text

256

No

SOR Type in local language

Attachments

9KB
SOR Type.xlsx

Last updated

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.